A data center project is proposed in Wheeling, with EPC named as the prime contractor, impacting local control and tax dollars.
1 report, 1 independent
Updated Jun 30
AI-generated analysis. Brind wrote this summary from the reports listed below. It can be wrong. Each section says how much you can rely on it, and the sources are linked so you can check.
What happened
A data center project is proposed in Wheeling, with EPC named as the prime contractor, impacting local control and tax dollars.