Europe's Gigabit Act faces spectrum limits for in-building Wi-Fi
What happened
Europe's Gigabit Infrastructure Act requires that every new or majorly renovated building in the EU be fibre-ready since February 12, 2026, and mandates that new multi-dwelling buildings have an access point open to operators. However, the Act's requirements are limited by Europe's Wi-Fi spectrum policy, which caps the 6 GHz allocation at 480 MHz. This cap is particularly challenging in multi-dwelling units where dozens of households share the same air.
From rcrwireless.com
Why it matters
While the Act successfully mandates that fibre reaches the flat, the unresolved spectrum policy limits the capacity of the final ten meters of connection, which rely on Wi-Fi. This creates a gap between the infrastructure promise and the actual device connectivity capacity across the continent.
From rcrwireless.com
Who's involved
Who could feel it
Possible knock-on effectsThese are possibilities Brind reasoned out, not predictions, and not advice. Most are not stated in any report.
- EuropeSpeculative
Europe might face market uncertainty regarding the full realization of infrastructure investment due to the unresolved spectrum issue.
- NetherlandsSpeculative
The Netherlands could see its national infrastructure investment driven by the fibre readiness mandates of the Act.