i-80 Gold Announces Feasibility Study for Granite Creek Underground Project
What happened
i-80 Gold Corp. announced the results of a feasibility study for the high-grade Granite Creek underground gold project. The project is situated in northern Nevada, USA, at the intersection of the Battle Mountain-Eureka and Getchell gold trends. The company stated that the production expectation for 2026 is between 30,000 and 40,000 ounces of gold.
From mining.com
Why it matters
The announcement is based on two technical reports: an NI 43-101 FS and an S-K 1300 PFS. These studies provide the technical and economic foundation for the company's production targets.
Sterling, Felix, and Blue Bell properties are located in Nevada, with Felix and Blue Bell pits situated at Granite Creek.
From mining.com
Who's involved
- Granite CreekLocation of the gold project
- NevadaLocation of the gold project
Keep exploring
The entities involved
-
Granite Creek
river in New Zealand; geonames ID = 6217821
Nothing else this week.
-
Nevada
state of the United States of America
Related events
- McEwen Mining is selling non-core gold properties in Ontario and preparing surface work in Nevada.
- A Vortex system is deployed at a Nevada mine, which is being analyzed by researchers based in Golden, Colorado.
- Equinox Gold Corp. is advancing its South Railroad project and operating in the Camino Rojo mine across Nevada and British Columbia.
- Carlin trend deposits in Nevada provide gold resources, transforming Barrick and Nevada Gold Mines joint ventures.