Brind.

Petition Urges NHAI to Assume Maintenance of Electronics City Flyover Post-Concession

1 report, 1 independent Updated Sep 22
AI-generated briefing. Brind wrote this from the reports listed below. It can be wrong. Each section says how much you can rely on it, and the sources are linked so you can check.

What happened

Some supportReported by 1 outlet

An online petition has urged the National Highways Authority of India and the Ministry of Road Transport and Highways to intervene regarding the Electronics City Flyover. The flyover, which was constructed under a Build-Operate-Transfer (BOT) model by Bengaluru Elevated Tollway Limited, has a 20-year concession period. This period began in 2006 and is scheduled to end on September 10, 2026. The petition calls for toll collection to stop after September 10, 2026, and that NHAI subsequently take over maintenance.

From thehindu.com

Why it matters

Some supportBrind's analysis of the reports

The petition argues that toll collection was meant to recover all costs incurred by the concessionaire to build, operate, and maintain the infrastructure, along with a reasonable return on investment. The demand is that NHAI assume responsibility for the flyover's maintenance following the concession expiry.

From thehindu.com

Who's involved

Keep exploring

The entities involved

Related events

Coverage

Newest first; wire copies grouped