Brind.
  1. The tunnel for the Teesta Stage VI Hydroelectric Power Project was constructed by Patel Engineering Limited for NHPC Limited.

A tunnel collapse has occurred in the NHPC Teesta Stage-VI hydropower project located in Sikkim.

1 report, 1 independent Updated Jul 21
AI-generated analysis. Brind wrote this summary from the reports listed below. It can be wrong. Each section says how much you can rely on it, and the sources are linked so you can check.

What happened

Some supportReported by 1 outlet

A tunnel collapse has occurred in the NHPC Teesta Stage-VI hydropower project located in Sikkim.

Who's involved

What this event is mainly about

How it developed

Newest first. Tap a step to see who reported it.
  1. NHPC is constructing the Teesta VI hydropower project in Sikkim.Sub-event
  2. Eastern and Western Coalfields are involved in the response to the tunnel collapse in Sikkim.Sub-event
  3. PM responds to tunnel collapse in Sikkim.Sub-event
  4. Tunnel collapse in the Teesta Stage-VI hydropower project in Sikkim.1 source

Keep exploring

The entities involved

Coverage

Newest first; wire copies grouped