Arada is developing Thameside West at Royal Docks, selecting Gensler for design and Arup for consultancy, with GLA collaboration.
1 report, 1 independent
Updated Jul 22
AI-generated analysis. Brind wrote this summary from the reports listed below. It can be wrong. Each section says how much you can rely on it, and the sources are linked so you can check.
What happened
Arada is developing Thameside West at Royal Docks, selecting Gensler for design and Arup for consultancy, with GLA collaboration.
Who's involved
What this event is mainly aboutKeep exploring
The entities involved
-
Gensler
American design and architecture firm
-
Greater London Authority
devolved regional governance body of Greater London