City Power operations disrupt supply in Midrand and Rabie Ridge
What happened
City Power operations led to supply disruptions in Rabie Ridge and Midrand. Officials found unauthorized installations, including a transformer inside a shack connected to illegally installed cables, which disrupted supply to Rabie Ridge. In Midrand, operations recovered cables valued at R500,000 and two transformers valued at R2 million.
From citizen.co.za
Why it matters
The utility reported that recovered cables and electricity equipment can only be sold as scrap material. These operations highlight infrastructure pressure and unauthorized installations affecting supply to customers in Rabie Ridge Extensions 1, 2, 3, and 5.
From citizen.co.za
Who's involved
- MidrandArea where the utility operations and supply disruptions occurred
Who could feel it
Possible knock-on effectsThese are possibilities Brind reasoned out, not predictions, and not advice. Most are not stated in any report.
- WoolworthsSpeculative
Woolworths might face increased costs or delays in its distribution center in Midrand due to infrastructure pressure.