Brind.

FHWA Reports on 1977 Washington State Road Project Using Recycled Asphalt

1 report, 1 independent Updated Sun 00:00
AI-generated briefing. Brind wrote this from the reports listed below. It can be wrong. Each section says how much you can rely on it, and the sources are linked so you can check.

What happened

Some supportReported by 1 outlet

The Federal Highway Administration reported on a 1977 road rehabilitation project carried out by Washington State Department of Transportation. The project reused most of the existing asphalt, replacing 45 mm of old pavement with recycled hot mix asphalt. This recycled mix contained about 72% reclaimed asphalt pavement and 0.75% recycling agent, without adding new asphalt cement.

From indiatimes.com

Why it matters

Some supportBrind's analysis of the reports

The project demonstrated that a large proportion of existing pavement could be reused in a new road layer rather than being discarded. The recycled asphalt provided 16 years of actual service, which was longer than the 10 years of the original layer it replaced.

From indiatimes.com

Who's involved

Keep exploring

The entities involved

Related events

Coverage

Newest first; wire copies grouped