Brind.
  1. The FAA is reviewing production lines for the 737 Max, noting that engine supplies are a current bottleneck for larger models.

GE Aerospace is finalizing modifications with the FAA while deliveries of GE9X turbofans to Boeing have been paused.

1 report, 1 independent Updated Jul 28
AI-generated analysis. Brind wrote this summary from the reports listed below. It can be wrong. Each section says how much you can rely on it, and the sources are linked so you can check.

What happened

Some supportReported by 1 outlet

GE Aerospace is finalizing modifications with the FAA while deliveries of GE9X turbofans to Boeing have been paused.

Who's involved

What this event is mainly about

How it developed

Newest first. Tap a step to see who reported it.
  1. GE Aerospace supplies components for Boeing Apache, and Dan Martin manages manufacturing engineering at the company.Sub-event
  2. General Electric is affected by production issues stemming from its airframe partners.Sub-event
  3. GE pauses GE9X deliveries to Boeing amid finalization of modifications with the FAA.1 source

Keep exploring

The entities involved

Related events

Coverage

Newest first; wire copies grouped
  • flightglobal.comGE9X engine shipments paused as GE addresses durability problem