- A survey conducted by NBS found that illicit drug trafficking affects Nigeria and the wider region of the Sahel/West Africa.
- The drug trade is a profit-driven industry in Nigeria.
- Drug operations are underway in Apapa, located in Lagos.
- Infrastructure failure impacts economic activity in Apapa, a city within the greater metropolitan area of Lagos.
Project delays on the Abidjan-Lagos Corridor Road caused economic hardship and compensation failure.
1 report, 1 independent
Updated Aug 18
AI-generated analysis. Brind wrote this summary from the reports listed below. It can be wrong. Each section says how much you can rely on it, and the sources are linked so you can check.
What happened
Project delays on the Abidjan-Lagos Corridor Road caused economic hardship and compensation failure.