How could the plug-in VPP program affect Consolidated Edison's grid operations?
Consolidated Edison may gain revenue and reduce grid stress from VPP program. The plug-in Virtual Power Plant (VPP) program, run by Jackery and Every Electric, aggregates demand response from thousands of individual batteries installed in New York City apartments. This aggregated storage capacity is sold to Consolidated Edison. This mechanism provides the utility with a new revenue stream while simultaneously reducing the amount of electricity that must flow through the grid during peak demand periods. This reduction in peak load lessens the need for expensive upgrades to transmission and distribution infrastructure.
- Effect
- Mild positive
- How direct
- Stated in the reporting
- When
- Within weeks
- The story
- Gone quiet
How it reaches Consolidated Edison
-
Jackery announced a partnership with Every Electric, a consumer energy aggregator based in Brooklyn, to launch a plug-in Virtual Power Plant (VPP) program in New York City apartment buildings. The program allows residents to earn money by connecting household appliances, such as air conditioners, to portable batteries. Customers can receive batteries for free with a refundable deposit, or they may purchase the batteries for a discounted price of $650.
The full event1independent outlet -
Every Electric monitors data from the batteries, aggregating the demand response of combined storage across thousands of individual batteries. This aggregated capacity is then sold to the utility, which in this case is Consolidated Edison. This process allows the utility to manage demand shifts actively.
1 report connects these two. Brind only summarizes; follow a link to read the reporting itself.
- cleantechnica.com Nov 21
-
energy company in the United States
Everything about Consolidated Edison
Tap any step to see the evidence behind it.
The facts so far
As reported. Each one links to where it comes from.
- The demand response of the combined storage across thousands of individual batteries is aggregated and sold to the utility, in this case Con Edison.cleantechnica.com
- Having storage at the point of use reduces the amount of electricity that needs to flow through the grid during peak periods.cleantechnica.com
- The initial trial phase included over 2000 batteries.cleantechnica.com
- The VPP is based on air conditioner use, using 120V air conditioners up to around 12,000 BTU.cleantechnica.com
Why it matters
For Consolidated Edison, this program represents a shift toward monetizing distributed energy resources. By purchasing aggregated demand response, the utility gains a new method of mitigating grid stress and potentially generating revenue from assets located at the customer level, rather than solely relying on large, centralized infrastructure.
This plug-in VPP model is presented as a fast, easy, and least expensive way to add battery capacity that shaves peak demand on urban grids in the US. It offers a blueprint for how urban areas, which often face complex fire regulations and permitting issues for large-scale Battery Energy Storage Systems (BESS), can integrate storage capacity.
What we don't know yet
- How will the volume of aggregated demand response scale as the program moves beyond the initial trial phase?
- What is the financial structure of the agreement that dictates how Consolidated Edison is compensated for the aggregated demand response?
What would change this answer
Who else could feel it
Other possible ripples from the same event.
Reporting
- cleantechnica.comNov 21
Keep going
Brind's analysis is written by AI from the reporting linked above and can be wrong. This explainer is a possibility worth considering, not a forecast: steps marked as Brind's reasoning are not stated in the reporting. It is not investment advice; do your own research.